Timeline
07/23/18:
- 17:55 Ticket #2890 (Overhaul of GradientBoostedTreesModelView) closed by
- done
- 17:54 Changeset [16000] by
- 17:52 Ticket #2914 (ResidualAnalysisView hides double columns containing NaN) closed by
- done
- 13:51 Changeset [15999] by
-
#2871: Removed bug smuggled in by implementing the review (Designer)
- 12:26 Changeset [15998] by
-
#2871: Implemented review
07/19/18:
- 15:20 Changeset [15997] by
- 15:12 Changeset [15996] by
- 13:37 Changeset [15995] by
-
#2839: adapted illustration of project and resource ancestry in HiveAdministrator and HiveJobAdministrator
07/14/18:
07/11/18:
- 16:43 Changeset [15994] by
-
#2886: Add symbolic regression solution to results during algorithm run and scale model.
- 10:34 Changeset [15993] by
-
#2886: refactor code
07/10/18:
- 23:06 Changeset [15992] by
-
#2839: fixed couple of minor issues
- changed tags in resource selector
- added project information in job list and adapted sortation
- fixed hand-down save by withdrawing additional offset-rights (permissions, resources),...
- 10:23 Changeset [15991] by
-
#2929 prepared plugin and empty algorithm class for PGE implementation
- 09:42 Changeset [15990] by
-
#2929: created branch for feature request
- 09:41 Ticket #2929 (Prioritized Grammar Enumeration for HeuristicLab) created by
- It would be great to be able to use PGE (prioritized grammar …
07/09/18:
- 12:59 Changeset [15989] by
-
- Adjusted the unit tests
- Refactoring of the sorter
- Bugfix on the BinPackerResidualSpaceBestFit packer
Note: See TracTimeline
for information about the timeline view.