Opened 14 years ago
Last modified 12 years ago
#1260 closed enhancement
Hive-3.3 development — at Version 7
Reported by: | cneumuel | Owned by: | cneumuel |
---|---|---|---|
Priority: | medium | Milestone: | |
Component: | Hive.General | Version: | branch |
Keywords: | Cc: |
Description (last modified by cneumuel)
General
Reduce memory footprint of jobs by calling Prepare() on algorithms after they finished. This clears all scopes and executioncontexts which greatly reduces memory footprint. Prepare() is called anyway after an OptimizerJob is downloaded and reassembled, so loosing the resultcollection is inevitable.
Experiment Manager
Reduce memory consumption~~
Server
- Deleting HiveExperiments with lots of large jobs attached takes a huge amount of time while locking the jobs-table rendering the server unusable. This needs to be faster.
Slave
Change History (7)
comment:1 Changed 14 years ago by cneumuel
- Status changed from new to accepted
comment:2 Changed 14 years ago by cneumuel
- Summary changed from Hive Development to Hive-3.3 Development
comment:3 Changed 14 years ago by cneumuel
- Summary changed from Hive-3.3 Development to Hive-3.3 development
comment:4 Changed 14 years ago by cneumuel
- Description modified (diff)
comment:5 Changed 14 years ago by cneumuel
- Description modified (diff)
comment:6 Changed 14 years ago by cneumuel
- Description modified (diff)
comment:7 Changed 14 years ago by cneumuel
- Description modified (diff)
Note: See
TracTickets for help on using
tickets.